Windows and Roof Repaired
18th May - Mezzanine Slides
Lifts, walls, stage and plant being installed 28th April 08
Progress in Construction 22nd April '08
Thursday, October 9, 2008
Thursday, March 20, 2008
Wednesday, March 12, 2008
Monday, March 10, 2008
MInutes 1/2/08
Read this doc on Scribd: Gardiner Street Minutes 1st Feb08
Gardiner Street Project Meeting Actions from Meeting of 1st Feb 2008 Attendance: Name Delegate Present Apologies Absent Paddy Gannon (PG) Don Cromer (DC) Phillip Power (PP) Kieran Timmons (KT) Graham Nugent (GN) Pat O’Leary (PO’L) Brian Horgan (BH) Wayne Early (WE) Rodney Cromer (RC) Vincent Doherty (VD) Brian Hewson (BH) Liam McDonnell (LMcD) Agreements: Next Project Meeting will be 29th February ‘08 Introduced Pat O’Leary as the H&S Co-ordinator to contractors & reviewed safety requirements on site, compliance with safety regs and documentation. Paddy Gannon agreed to act as Safety Officer on site Pat O’Leary to make arrangements to review H&S for TCN and contractors on site biweekly. Follow up meeting to be arranged for Tuesday 5th Feb with McKennas and Vincent Doherty to agree co-ordination for M&E works with builders program. Restoration of 16No. 1900c radiators by Wilsons to be distributed in building as follows;R114, 101,102,121,113,112 & R111 on the Ground Floor, (16 sections, approx 51”x38”) R201 & R202 on the First Floor (14 sections, approx size 41”x38”) R206 & R214 in hall on First Floor (12 sections, approx size, 36”x38”) R211, 210, 209, 208, & R207 in the Library Room (14 sections, approx 41”x38”) • Plant room to have studwork re-enforced by plywood on outer wall facing Gardiner Street. • Suspended ceiling in plant room to be positioned 60mm from beams and beams to be enclosed, maximise head height in plant room to be retained. • Remaining steel piping and boiler sections to be removed by McKennas • Dervans to provide detail for damper in Plant room for McKennas • McKennas to ensure the sub-contractor for under floor heating and installation of solar panels is approved by SEI so TCN can apply for grant. • Doors were ordered from Tracey joinery by Don, finished have been agreed. • Lucianno due to begin work on ceiling of auditorium on 4/2/08, method statements to be provided. Actions: Ref. Action Point 010208.01 All contractors to provide safety statements, risk analysis and method statements to Paddy Gannon, to be held on file on site. Decision on access chambers for Assigned All Completion Date 15/2/08 Status Open 010208.04 DC 15/2/08 Open 2264731.doc 010208.06 010208.07 010208.08 010208.09 010208.10 010208.11 010208.12 010208.13 010208.14 010208.15 010208.16 floor and suspended ceiling on ground floor Distance centre to centre for 1900c conservation rads to be provided to Mckennas for piping Damper detail to be provided to Mckenna Under floor heating for 1st Floor, detail for prep to be agreed Provide joinery schedule and costs to Graham McKenna to revise initial draft program of work following meeting Vincent Doherty to provide up top date work program Construction drawings to be provided on site for Paddy Gannon Agree and mark up locations on ground floor for conduit piping, cabling, switches with Vincent Doherty and builder. Lighting spec/fittings which are being sourced. Confirm if there is a cost implication to this change of spec. Hot water facilities to be provided on site., requested by Paddy Gannon. Method statements for repair of ceiling to be written for Architect GN WE DC/WE DC KT VD WE DC/PG/PP 15/2/08 15/2/08 15/2/08 05/2/08 15/02/08 15/2/08 15/2/08 15/2/08 Open Open Open Open Open Open Open Open PP KT/PP RC 29/2/08 29/2/08 29/2/08 Open Open Open Closed Actions Ref. 010208.02 010208.03 010208.05 060108.01 Action Point Provide Safety signs for display at entrance Arrange site meeting to agree work program with M&E contractors Max height for switch board in plant room and put into manufacture Grant Application for conservation works submitted to DCC by Thursday 31/1/08 Assigned GN GN PP DC Completion Date 15/2/08 05/01/08 05/01/08 31/01/08 Status Closed Closed Closed Closed 2264731.doc
Gardiner Street Project Meeting Actions from Meeting of 1st Feb 2008 Attendance: Name Delegate Present Apologies Absent Paddy Gannon (PG) Don Cromer (DC) Phillip Power (PP) Kieran Timmons (KT) Graham Nugent (GN) Pat O’Leary (PO’L) Brian Horgan (BH) Wayne Early (WE) Rodney Cromer (RC) Vincent Doherty (VD) Brian Hewson (BH) Liam McDonnell (LMcD) Agreements: Next Project Meeting will be 29th February ‘08 Introduced Pat O’Leary as the H&S Co-ordinator to contractors & reviewed safety requirements on site, compliance with safety regs and documentation. Paddy Gannon agreed to act as Safety Officer on site Pat O’Leary to make arrangements to review H&S for TCN and contractors on site biweekly. Follow up meeting to be arranged for Tuesday 5th Feb with McKennas and Vincent Doherty to agree co-ordination for M&E works with builders program. Restoration of 16No. 1900c radiators by Wilsons to be distributed in building as follows;R114, 101,102,121,113,112 & R111 on the Ground Floor, (16 sections, approx 51”x38”) R201 & R202 on the First Floor (14 sections, approx size 41”x38”) R206 & R214 in hall on First Floor (12 sections, approx size, 36”x38”) R211, 210, 209, 208, & R207 in the Library Room (14 sections, approx 41”x38”) • Plant room to have studwork re-enforced by plywood on outer wall facing Gardiner Street. • Suspended ceiling in plant room to be positioned 60mm from beams and beams to be enclosed, maximise head height in plant room to be retained. • Remaining steel piping and boiler sections to be removed by McKennas • Dervans to provide detail for damper in Plant room for McKennas • McKennas to ensure the sub-contractor for under floor heating and installation of solar panels is approved by SEI so TCN can apply for grant. • Doors were ordered from Tracey joinery by Don, finished have been agreed. • Lucianno due to begin work on ceiling of auditorium on 4/2/08, method statements to be provided. Actions: Ref. Action Point 010208.01 All contractors to provide safety statements, risk analysis and method statements to Paddy Gannon, to be held on file on site. Decision on access chambers for Assigned All Completion Date 15/2/08 Status Open 010208.04 DC 15/2/08 Open 2264731.doc 010208.06 010208.07 010208.08 010208.09 010208.10 010208.11 010208.12 010208.13 010208.14 010208.15 010208.16 floor and suspended ceiling on ground floor Distance centre to centre for 1900c conservation rads to be provided to Mckennas for piping Damper detail to be provided to Mckenna Under floor heating for 1st Floor, detail for prep to be agreed Provide joinery schedule and costs to Graham McKenna to revise initial draft program of work following meeting Vincent Doherty to provide up top date work program Construction drawings to be provided on site for Paddy Gannon Agree and mark up locations on ground floor for conduit piping, cabling, switches with Vincent Doherty and builder. Lighting spec/fittings which are being sourced. Confirm if there is a cost implication to this change of spec. Hot water facilities to be provided on site., requested by Paddy Gannon. Method statements for repair of ceiling to be written for Architect GN WE DC/WE DC KT VD WE DC/PG/PP 15/2/08 15/2/08 15/2/08 05/2/08 15/02/08 15/2/08 15/2/08 15/2/08 Open Open Open Open Open Open Open Open PP KT/PP RC 29/2/08 29/2/08 29/2/08 Open Open Open Closed Actions Ref. 010208.02 010208.03 010208.05 060108.01 Action Point Provide Safety signs for display at entrance Arrange site meeting to agree work program with M&E contractors Max height for switch board in plant room and put into manufacture Grant Application for conservation works submitted to DCC by Thursday 31/1/08 Assigned GN GN PP DC Completion Date 15/2/08 05/01/08 05/01/08 31/01/08 Status Closed Closed Closed Closed 2264731.doc
Saturday, March 8, 2008